Architecture
Requirements, risks, and evidence before heavy spend.
Small-batch board builds, bring-up, rework and instrumentation for EVT, with the same footprint libraries and test points the production line will use, so the move to volume is a quantity change, not a redesign.
Small-batch board builds, bring-up, rework and instrumentation for EVT, with the same footprint libraries and test points the production line will use, so the move to volume is a quantity change, not a redesign.
Requirements, risks, and evidence before heavy spend.
Electronics, mechanics, and firmware on one schedule.
EVT/DVT with factory-representative units and test scripts.
SMT, assembly, and NPI on the same lines that validated the design.
Send a brief through Start a build. We review stage, technical risk and manufacturing fit, then propose ODM, JDM, OEM, CM or a recovery path with a scoped first phase.
You own your product IP, design files, firmware and test specs. Ownership is written into the contract before work begins. Under JDM, a subsystem ownership map is agreed at kickoff.
With ODM we do the engineering and the production. With OEM you hand us a released design and we build it to your spec. See partner models for JDM and CM.
New product introduction: the EVT, DVT and PVT builds, fixtures, test coverage and documentation that turn a working design into something the line can build the same way every time.
Yes. Most of our programs start at seed or Series A with a working prototype. We size the first phase to the next milestone you need to hit.
ISO 9001 and ISO 13485 quality management systems and BSCI social compliance. We have taken client products through UL; listings are product-specific and owned by the client.
Yes, before we review detailed files.
Engineering and production are in Shenzhen, China, with design reviews held in your time zone.