Pilot builds
PVT lots with sellable intent and documented limits.
A controlled path from validated design to repeatable production.
NPI (new product introduction) is the controlled transition from a validated design to repeatable production: pilot builds, line test, yield analysis, and ramp. Hardware Form runs NPI on the same factory relationship that built your EVT units.
See EVT vs DVT vs PVT and testing and quality.
PVT lots with sellable intent and documented limits.
EOL sequences aligned with EVT/DVT evidence.
Feedback to engineering without a translation layer.
Volume increases with quality gates—not hope.